Figure 4: Opening The Container - Mellanox Technologies MIS5200Q-4DNC Hardware Installation Manual

216-port infiniband qdr switchx switch platform
Hide thumbs Also See for MIS5200Q-4DNC:
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual
3. Unscrew the sides of the crate.
4. Remove and put aside the box.
5. Visually inspect the chassis, make sure that:
• there is no visible damage
• all 6 spines are installed
• 4 PSUs are installed for the chassis
• all 4 fans are installed
• 1 management module is installed
6. Remove all protective plastic film from all sides and top of the chassis.
7. If you are not using a mechanical lift to install the chassis, reduce the weight of the
chassis by removing all of the spines, power supply units, management modules, and
fan units, and put aside for reinstallation after the chassis is installed in the rack.
1.6.1.5 Installing the Shelf
1. Place the ESD mat on the floor where you will be working and put on the ESD strap.
Make sure the ESD strap is touching your skin and that the other end is connected to
a verified ground.
2. Make sure you have the spine side close to the doors to ensure maximum cable bend-
ing room
Mellanox Technologies

Figure 4: Opening the Container

Container screws
It is highly recommended to have a screw gun or electric screwdriver for this step.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mis5100q-3dnc

Table of Contents