Remove the nylon covers from the chassis.
Step 4.
Visually inspect the chassis, make sure that:
Step 5.
• There is no visible damage
• 10 PSUs are installed
Remove all protective plastic film from the sides and top of the chassis.
Step 6.
Unpack the system and check against the parts list to make sure that all the parts have
been sent. Check the parts for visible damage that may have occurred during shipping.
If anything is damaged or missing, contact your customer representative immediately.
Do not remove any of the blocks or the lock-down bars at this time.
Mellanox Technologies
Figure 6: Crate Screws
Installation
27