Parts included in the installation kit:
- 1 shelf with brackets pre-installed
- 1 left side upper bracket offset
- 2 lock down bars
- 8 lock washers for the upper brackets to verti-
cal support
- 12 hex head bolts – 8 for the upper
brackets and 4 for the shelf extension
- 34 pan head screws for the caged nuts 20 for
the shelf and 14 for the chassis faceplate
- 32 lock washers – 20 for the lock down bars
and 12 for the upper brackets to upper bracket
offsets
- 2 upper brackets
- 1 open end ratchet wrench 10mm
- 1 socket wrench
- 2 extensions for the socket driver
- 4 flat washers for the shelf extension
Parts included in the cable management installation kit:
- 1 cable management rack RH
- 16 caged nuts M6
Mellanox Technologies
It is recommended to have at least two people for the duration of the installation proce-
dure. Use a mechanical lift to raise this chassis. If not, use enough manpower to ensure
the safety and wellbeing of all of the people involved in the installation.
- 1 shelf extension
- 1 right side upper bracket offset
- 2 upper bracket washers
- 12 lock washers for the upper brackets to
upper bracket offsets
- 34 caged nuts 20 for the shelf and 14 for the
chassis faceplate
- 20 flat washers– 8 for the lock down bars
and 12 for the upper brackets
- 32 hex head bolts – 20 for the lock down
bars and 12 for the upper brackets to upper
bracket offsets
- 12 flat head screws with locktite for the
upper bracket offsets
- 1 socket nut driver 8mm
- 1 socket nut driver 10mm
- 1 socket nut driver 13mm
- 1 cable management rack LH
- 16 M6 bolts