InfiniBand Switch Platform Hardware User Manual
1.6.3.4 Opening the Container
1. Before starting the procedure, put the ESD strap on and connect it to a valid ground.
2. Remove the four sides of the container by unscrewing the phillips head screws hold-
ing the sides on.
3. Remove and put aside the box.
4. Visually inspect the chassis, make sure that:
• there is no visible damage
• all 12 spines are installed
• 6 PSUs are installed for the chassis
• all 4 fans are installed
• 1 management module is installed
5. Remove all protective plastic film from all sides and top of the chassis.
Mellanox Technologies
Figure 4: Container Screws
Container screws
It is highly recommended to have a screw gun or electric screwdriver for this step.
22