648 Port InfiniBand QDR Switch Platform User Manual
19.
Screw down the second lock-down bar.
20.
Remove the shelf extension and save for removal of the chassis.
21.
Connect a valid ground, See Section 3, "Ground Connections," on page 38, for
detailed instructions.
22.
Go to Section 6, "Chassis Power Up," on page 43 to power up the switch system.
Mellanox Technologies
Figure 22: Bolt and Washer Order
Rev 2.1
31