5: Configure Connection (Cnct) Setting - Electro Industries Shark 100 Installation & Operation Manual

Low cost, high performance multifunction electricity meter
Hide thumbs Also See for Shark 100:
Table of Contents

Advertisement

7.3.3.5: Configure Connection (Cnct) Setting

Push the DOWN Button to scroll all the parameters in Configuration Mode: Scroll, CT, PT,
Connection (Cnct) and Port. The 'Active" parameter is in the A Screen and is flashing.
Push ENTER when Cnct is the 'Active' parameter and the Connection screen appears for your
meter. To change this setting, use the RIGHT button to scroll through the three settings. Select the
setting that is right for your meter.
The possible Connection configurations include:
3 Element WYE
2.5 Element WYE
2 CT Delta
3 Element Wye
Push ENTER and the screen scrolls through the other CFG parameters.
Push DOWN or RIGHT and the Password screen appears (see section 7.3.2.1).
Push MENU and you will return to the MAIN MENU.
e
Electro Industries/GaugeTech
2.5 Element Wye
Doc # E145701
2 CT Delta
7-8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 100tShark 100

Table of Contents