Electro Industries Shark 100 Installation & Operation Manual page 103

Low cost, high performance multifunction electricity meter
Hide thumbs Also See for Shark 100:
Table of Contents

Advertisement

Phase-to-Phase Voltage ( Points 4 - 6 )
These points are formatted as 2's complement fractions. They represent a fraction of a 300 V
Secondary input. Inputs of above 300 V Secondary will be pinned at 300 V Secondary.
Phase Current ( Points 7 - 9 )
These points are formatted as 2's complement fractions. They represent a fraction of a 10 A
Secondary input. Inputs of above 10A Secondary will be pinned at 10 A Secondary.
Total Power ( Points 10 - 11 )
These points are formatted as 2's complement fractions. They represent a fraction of 4500 W
Secondary in normal operation, or 3000 W Secondary in Open Delta operation. Inputs above/below
+/-4500 or +/-3000 W Secondary will be pinned at +/-4500 or +/-3000 W Secondary, respectively.
Total VA (Point 12 )
This point is formatted as a 2's complement fraction. It represents a fraction of 4500 W Secondary
in normal operation, or 3000 W Secondary in Open Delta operation. Inputs above/below +/-4500 or
+/-3000 W Secondary will be pinned at +/-4500 or +/-3000 W Secondary, respectively.
e
Electro Industries/GaugeTech
Point
4
Phase AB Voltage
5
Phase BC Voltage
6
Phase CA Voltage
Point
Reading
7
Phase A Current
8
Phase B Current
9
Phase C Current
Point
10
Total Watt
11
Total VAR
Point
12
Doc # E145701
Reading
Reading
Reading
Total VA
D-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 100tShark 100

Table of Contents