8. Service: Current Only Measurement (Three Phase)
N
N
Select: "3 EL WYE" (3 Element Wye) in Meter Programming setup.
* Even if the meter is used for only amp readings, the unit requires a Voltage reference.
Please make sure that the voltage input is attached to the meter.
AC Control Power can be used to provide the Reference Signal.