Electro Industries Shark 100 Installation & Operation Manual page 58

Low cost, high performance multifunction electricity meter
Hide thumbs Also See for Shark 100:
Table of Contents

Advertisement

The Device Status screen appears,
confirming a connection.
Click OK.
The main screen of Communicator
EXT software reappears.
Profile
Button
4. Click the Profile button on the toolbar.
A set of Shark Profile Programming Screens appears.
5. Click the Communication tab.
The Communication Settings appear.
Use pull-down menus to change settings, if
desired.
Communication Settings
COM1 (IrDA)
Response Delay (0-750 msec)
COM2 (RS485)
Address (1-247)
Protocol (Modbus RTU, ASCII or DNP)
Baud Rate (9600 to 57600)
Response Delay (0-750 msec)
6. When changes are complete, click the
Update button to send a new profile to
the meter.
7. Click Cancel to Exit the Profile (or)
8. Click other tabs to update other aspects of the Profile (see section 5.2.2 below).
e
Electro Industries/GaugeTech
Doc #: E145701
5-8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark 100tShark 100

Table of Contents