Concluding Steps; Replacing The Power Distribution Board; Preliminary Steps; Removing The Hot-Plug Power Supply Units - Fujitsu PRIMERGY TX140 S2 Upgrade And Maintenance Manual

Primergy
Hide thumbs Also See for PRIMERGY TX140 S2:
Table of Contents

Advertisement

6.3.3.4

Concluding steps

Ê Connect the power cord to the new power supply unit and secure it with a
cable tie as described in section
page
67.
Ê Only when replacing a power supply unit in a non-redundant configuration:
"Switching on the server" on page 68
"Performing a fan test after replacing a defective fan" on page 96
Ê
6.3.4

Replacing the power distribution board

Field Replaceable Unit
(FRU)
Tools: tool-less
6.3.4.1

Preliminary steps

"Locating the defective server" on page 43
Ê
"Disabling BitLocker functionality" on page 69
Ê
"Shutting down the server" on page 46
Ê
"Disconnecting the server from the mains" on page 46
Ê
"Getting access to the component" on page 47
Ê
"Removing the fan module" on page 151
Ê
6.3.4.2

Removing the hot-plug power supply units

Ê Remove all power supply units as described in
supply unit" on page
TX140 S2
"Connecting the server to the mains" on
110.
Upgrade and Maintenance Manual
Power supply
Hardware: 15 minutes
"Removing a hot-plug power
113

Advertisement

Table of Contents
loading

Table of Contents