Switching On The Server - Fujitsu PRIMERGY TX140 S2 Upgrade And Maintenance Manual

Primergy
Hide thumbs Also See for PRIMERGY TX140 S2:
Table of Contents

Advertisement

Basic hardware procedures
4.7

Switching on the server

V
CAUTION!
Before switching on the server, make sure the top / side cover is
closed. In order to comply with applicable EMC regulations
(regulations on electromagnetic compatibility) and satisfy cooling
requirements, the server must not run while the top / side cover is
removed.
After connecting all power cords, wait at least 60 seconds before
pressing the On/Off button.
Follow the safety instructions in chapter
page
31.
Ê Press the On / Off button to start up the server.
Ê Ensure that the power-on indicator above the On / Off button is lit green.
Ê Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.
68
Upgrade and Maintenance Manual
"Important information" on
TX140 S2

Advertisement

Table of Contents
loading

Table of Contents