Installation On A Din Rail - Siemens SCALANCE X-200 Operating Instructions Manual

Industrial ethernet switches
Hide thumbs Also See for SCALANCE X-200:
Table of Contents

Advertisement

4.2

Installation on a DIN rail

Installation
Install the IE Switch X-200 on a 35 mm DIN rail complying with DIN EN 60715.
1. Place the upper catch of the device over the top of the DIN rail and then push in the lower
2. Fit the connectors for the power supply.
3. Fit the connectors for the signaling contact.
4. Insert the terminal blocks or M12 cable connectors into the sockets on the device.
Figure 4-1
Uninstalling
Removing an IE Switch X-200 from a DIN rail:
1. First disconnect all connected cables.
2. Use a screwdriver to release the lower DIN rail catch of the device and pull the lower part
SCALANCE X-200
Operating Instructions, 12/2011, A5E00349864-19
part of the device against the rail until it clips into place.
IE Switch X-200 removing from a DIN rail (35 mm)
of the device away from the rail.
Figure 4-2
IE Switch X-200 removing from a DIN rail (35 mm)
Installation
4.2 Installation on a DIN rail
131

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents