Performing The Installation Acceptance Tests; Upgrading To A Four-Port Configuration; Installing The Voice Processing Card - AT&T MERLIN MAIL Implementation Manual

Voice messaging system for merlin ii communications system release 3
Hide thumbs Also See for MERLIN MAIL:
Table of Contents

Advertisement

Performing the Installation Acceptance Tests

Upgrading to a Four-Port Configuration

INSTALLING THE
VOICE PROCESSING
CARD
After you connect the MERLIN MAIL system unit to the
MERLIN II R3 system, perform the following tests:
Place a call to each MERLIN MAIL system port. The
1
prerecorded greetings should play for each port.
Place a call to the port where the modem is connected.
2
You should hear the modem tone.
Customers with two-port configurations may want to
upgrade to a four-port configuration for the following
reasons:
To add more lines.
To add more subscribers.
To add another service.
To upgrade the MERLIN MAIL system from a two-port to
a four-port configuration, follow the procedure below:
Turn off the MERLIN MAIL system unit. (The on/off
1
switch is located on the front of the unit on the
lower right.)
Unplug the power cord before removing the cover.
2
Make sure the MERLIN MAIL system
WARNING:
unit is unplugged before removing the cover.
Hazardous voltage inside. Risk of electric shock.
Installing the MERLIN MAIL System
1-7

Advertisement

Table of Contents
loading

Table of Contents