Installing Hardware Options
d. For shipment or for optional added security, install the retaining screw,
which ships in a plastic bag with your power supply option kit.
Figure 3-40: Installing the retaining screw
IMPORTANT: Whenever power is first applied to a hot-plug power supply, booting may
be delayed as long as 10 seconds.
5. Reinstall the Torx T-15 tool.
3-50
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide