After installing hardware options, install the access panel. Be sure that the panel
is locked into place securely before powering up the server.
Installing the access panel
1. Place the access panel on the chassis and slide it toward the front of the
server.
2. Tighten the two thumbscrews.
3. Close the bezel ("Unlocking the bezel" on page 22).
4. Power up the server ("Powering up the server" on page 21).
CAUTION: Do not operate the server for long periods with the
access panel open or removed. Operating the server in this manner
results in improper airflow and improper cooling that can lead to thermal
damage.
IMPORTANT: Be sure that the panel is locked into place securely
before powering up the server.
Server operations
23
Need help?
Do you have a question about the ProLiant ML310 Generation 3 and is the answer not in the manual?
Questions and answers