Installing the Rack Server
5. Release the rail compression lever to seat the locking mechanism in the square
hole in the vertical rack post.
Figure 5-4: Releasing the rail compression lever
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
5-9