Front Panel Led Activity During The Power-On Sequence; Powering Up The Tower Server - HP ML530 - ProLiant - 128 MB RAM Setup And Installation Manual

Generation 2 server
Hide thumbs Also See for ML530 - ProLiant - 128 MB RAM:
Table of Contents

Advertisement

Installing the Tower Server
To power up the server:
1. Open the front bezel door and press the Power On/Standby button to power up
the server.
Figure 6-3: Powering up the tower server
2. Observe the front panel LEDs to be sure that the server has a successful
power-on sequence. The following table describes a successful power-on
sequence.
Table 6-2: Front Panel LED Activity During the Power-On
Sequence
Item
Unit Identification (UID)
Internal health
External health
Embedded NIC connector
activity
System power
Note: For a detailed explanation of all system LEDs, see Appendix C,
"System LEDs and Switches."
6-6
Description
Off
From off to green
From off to green
From off to green if there is a link on the NIC
From off to flashing green for network activity
From amber to green
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide

Advertisement

Table of Contents
loading

Table of Contents