Preparing The Server For Rack Installation; Inserting Screws To Secure The Rack Rail Assembly In The Rack - HP ML530 - ProLiant - 128 MB RAM Setup And Installation Manual

Generation 2 server
Hide thumbs Also See for ML530 - ProLiant - 128 MB RAM:
Table of Contents

Advertisement

Installing the Rack Server
6. Repeat steps 2 through 5 for the right rack rail assembly.
7. For additional security or for stability during shipping, insert a 6 x 12 mm
Phillips screw into the top hole of each rack rail assembly at both the front and
rear of the rack.
Figure 5-5: Inserting screws to secure the rack rail
assembly in the rack

Preparing the Server for Rack Installation

To prepare the server for rack installation:
Attach the server rails.
Remove the power supplies.
Attach the cable management arm bracket.
5-10
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide

Advertisement

Table of Contents
loading

Table of Contents