Completing The Repackaging; Repackaging The Redundant Ac-Input Power Supplies - Cisco GSR12/60 - 12012 Router -AnyLAN, SONET/SDH Installation And Configuration Manual

Gigabit switch router
Table of Contents

Advertisement

Completing the Repackaging

This section provides procedures for completing the Cisco 12012 repackaging. Included
are procedures for positioning the large cardboard box on the pallet, repackaging the third
and fourth AC-input power supplies in the large cardboard box, and repackaging the
accessories box in the large cardboard box.
If your system is configured with AC-input power supplies, proceed to the section
"Repackaging the Redundant AC-Input Power Supplies," for the procedure on repackaging
the power supplies for shipment.
If your system is configured with DC-input power supplies, perform the following steps:
Step 1
Step 2
Step 3

Repackaging the Redundant AC-Input Power Supplies

Two AC-input power supplies are shipped installed in the Cisco 12012 power supply bay.
If your system is configured with three or four AC-input power supplies, the third and
fourth power supplies are shipped packaged in foam inserts inside a large cardboard box
mounted to the front of the pallet.
Perform the following steps to repackage the third and fourth AC-input power supplies in
their shipping container:
Step 1
Step 2
Position the empty large cardboard box on the front of the pallet so that the two
foam brackets mounted to the outside of the box are positioned under the system
air filter tray. These foam brackets prevent the cardboard box from coming loose
during transit.
Stack the bottom and top halves of the power supply foam inserts in the large
cardboard box.
Proceed to the section "Repackaging the Accessories Box," in this appendix, to
complete the repackaging procedure.
Position the empty large cardboard box on the front of the pallet so that the two
foam brackets mounted to the outside of the box are positioned under the system
air filter tray. These foam brackets prevent the cardboard box from coming loose
during transit.
Place the bottom half of the power supply foam insert in the bottom of the large
cardboard box.
Completing the Repackaging
Repackaging the Cisco 12012 A-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

12012

Table of Contents