Reinstalling The Card Cage Assembly - Cisco GSR12/60 - 12012 Router -AnyLAN, SONET/SDH Installation And Configuration Manual

Gigabit switch router
Table of Contents

Advertisement

Reinstalling the Cisco 12012 Components after Installing the Frame

Reinstalling the Card Cage Assembly

This section contains the instructions for reinstalling the card cage assembly in the frame.
Caution
people to safely lift the card cage assembly. To prevent injury, keep your back straight and
lift with your legs, not your back.
Perform the following steps to reinstall the card cage assembly:
Step 1
Step 2
Step 3
3-24 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide
The empty card cage assembly weighs 65 pounds (29.5 kg). You need two
With one person positioned on each side of the card cage assembly, grasp the
handle on the front of the card cage assembly and the handhold cutout on the side
of the card cage assembly.
Lift the card cage assembly and position it on the rails inside the front of the
frame. Slide the card cage assembly fully into the frame until the card cage
assembly front flanges make contact with the front of the frame.
Note
All electrical connections between the card cage assembly and the wiring
harnesses attached to the frame are made automatically as you slide the card
cage assembly in the frame.
Secure the card cage assembly to the frame by tightening the six captive screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

12012

Table of Contents