Cisco GSR12/60 - 12012 Router -AnyLAN, SONET/SDH Installation And Configuration Manual page 117

Gigabit switch router
Table of Contents

Advertisement

The mounting holes are drilled in the frame so that one mounting hole in each group aligns
with a mounting hole in the rack. By using the corresponding mounting hole (in the same
group) on the opposite side of the frame, you can level the frame in the rack.
An empty frame weighs 75 pounds (34 kg). You need two people to safely lift
Caution
the frame. To prevent injury, keep your back straight and lift with your legs, not your back.
Perform the following steps to remove the frame from the shipping pallet and install it in a
rack:
Step 1
Remove the four bolts and retainer clips that secure the base of the frame to the
pallet.
Step 2
With one person positioned on each side of the frame, grasp the front and side
of the frame, lift the frame off of the pallet, and position the frame in the rack.
(See Figure 3-12.)
If you installed the optional brace bar, rest the frame on the brace bar while you
Step 3
perform the next step. If you did not install the optional brace bar, two people
are needed to support the weight of the frame while a third person performs the
next step.
If you want to install the brace bat at this time, refer to the section
Note
"Installing the Brace Bar," earlier in this chapter; then continue with Step 3
above.
Rack-Mounting the Frame
Installing a Cisco 12012 3-21