Download Print this page

Tests Before Commissioning - probst SM-1200 Operating Instructions Manual

Advertisement

Available languages

Available languages

6.3 Tests before commissioning

1. Check that all screw connections are tight.
2. Check the tightness of the vacuum system
P.48).
3. Check all functions of the lifting device:
 Load suction
 Replace load
 Warning device
4. Perform several lifting tests with one load.
Lifting attempts : The installation is complete when the following conditions are met:
After the power supply fails, the load is maintained for at least five minutes (only
with suction-tight loads).
The load to be lifted has sufficient inherent stability so that it is not damaged
during gripping and handling.
The tests required in Europe in accordance with DIN EN 13155 prior to commissioning are cove-
red by a type test.
EN - 30.30.01.04558 - 00 - 09/24
(> see chap. 9.4.3 Checking the tightness of the lifting device,
6 Installation
25 / 53

Advertisement

loading
Need help?

Need help?

Do you have a question about the SM-1200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel