Download Print this page

Important Information; The Technical Documentation Is Part Of The Product; Notes On Handling These Operating Instructions; Other Applicable Documents - probst SM-1200 Operating Instructions Manual

Advertisement

Available languages

Available languages

1 Important information

1.1 The technical documentation is part of the product

1. To ensure trouble-free and safe operation, follow the instructions in the documents.
2. Keep the technical documentation close to the product. It must be accessible to personnel at all times.
3. Pass the technical documentation on to subsequent users.
 Failure to observe the instructions in this operating manual can result in life-threatening injuries!
 Probst accepts no liability for damage or malfunctions resulting from non-compliance with the instructions.
If you still have questions after reading the technical documentation, please contact Probst Service at:
www.probst-handling.com

1.2 Notes on handling these operating instructions

The product stone magnet is generally called a lifting device.
Probst GmbH is generally referred to as Probst in these operating instructions.
These operating instructions contain important instructions and information on the various operating phases of
the lifting device:
Transportation, storage, commissioning and decommissioning
Safe operation, necessary maintenance work, rectification of any faults
The operating instructions describe the lifting device at the time of delivery by Probst.

1.3 Other applicable documents

Operating instructions or battery data sheet
Charger operating instructions
Spare and wear parts list
Operating instructions Vacuum generator (vacuum pump or vacuum blower)

1.4 Symbols

This symbol indicates useful and important information.
✓ This symbol stands for a prerequisite that must be fulfilled before a step can be taken.
 This symbol stands for an action to be carried out.
 This symbol stands for the result of an action.
Actions consisting of more than one step are numbered:
1. First action to be performed.
2. Second action to be performed.
EN - 30.30.01.04558 - 00 - 09/24
1 Important information
7 / 53

Advertisement

loading
Need help?

Need help?

Do you have a question about the SM-1200 and is the answer not in the manual?

Questions and answers