Malaguti DRAKON125 2022 Workshop Manual page 9

Table of Contents

Advertisement

should be connected first.
9. When the fuse is blown, the reason
shall be checked and the corresponding
fuse must be replaced according to the
specified capacity after repair.
10. The covers shall cover the terminal
after the operation.
11. When disassembling the connector
with lock, the lock must be released before
operation.
When disassembling the connector, hold
the connector body and do not pull the
wire harness.
Before connecting the connector, the
terminal shall not be broken or bent,
confirm that the terminal is not too long or
falling off, and the connector should be
fully inserted.
12. The harness fixing belt shall be tightly
fastened to the specified position of the
13. When wiring, it should be noted that
when the handle is turned left and right to

Advertisement

Table of Contents
loading

Table of Contents