1D-25 Engine Mechanical:
EGR Valve Removal and Installation
CAUTION
!
When replacing EGR valve, perform
"Initialize EGR valve data" mode of SUZUKI
scan tool referring to "EGR Valve Data
Initialization".
Removal
1) Disconnect negative (–) cable at battery.
2) Remove engine cover.
3) Remove air intake pipe referring to "Air intake Pipe
Removal and Installation: ".
4) Disconnect EGR valve connector (1) and EGR pipe
(2) from EGR valve (3).
5) Remove EGR valve from intake manifold.
2
3
S5JB0B1406071
3
1
I5JB0B120007-01
Installation
1) Install EGR valve (1) to intake manifold.
Tightening torque
EGR valve bolt (a): 25 N·m (2.5 kgf-m, 18.0 lb-ft)
2) Connect EGR valve connector (2) and EGR pipe (3)
to EGR valve.
1
3
1
3) Install air intake pipe referring to "Air intake Pipe
Removal and Installation: ".
4) Install engine cover.
5) Connect negative (–) cable at battery.
(a)
2
I5JB0B120008-01