Hydraulic And Electrical Installation - Pentair E-Box MAESTRO Installation And Operation Manual

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box MAESTRO - Installation
4.9.2

Hydraulic and electrical installation

The diagram below illustrates the electrical and hydraulic connections of the Probe Unit with the
analysis chamber.
Mandatory
It is imperative to isolate the bypass by closing both valves before changing a probe.
Risk of flooding.
Earth
4
1
The probe cables must not cross the
power cable (risk of interference) or be
wound on themselves.
42 / 110
1
3
4
2
Ø10 mm
5
The hydraulic network must be connected
to earth by means of a device validated by
an electrician so as not to alter the
reading accuracy of the probes.
Ref. SB-CU-IMP-062EBA / A - 11.05.2023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb-pf-ens-002e

Table of Contents