HPE ProLiant DL380 Gen10 Plus User Manual page 95

Table of Contents

Advertisement

6. Attach the ground (earthed) wire to the ground screw and washer and tighten to 1.47 N m (13 lb-in) of torque. The ground wire
must be connected before the -48 V wire and the return wire.
7. Insert the -48 V wire into the left side of the terminal block connector, and then tighten the screw to 1.3 N m (10 lb-in) of torque.
Installing the HPE 800 W Flex Slot -48 VDC hot-plug power supply
95

Advertisement

Table of Contents
loading

Table of Contents