Pipe Racks - JLG ES1932 Operation & Safety Manual

Table of Contents

Advertisement

When the carrier tray is loaded, the increase of area exposed to wind will decrease
stability. Refer to the decal for maximum panel size and wind speed.
Ensure no personnel are beneath the platform.
Do not exit the platform over the rails, or stand on the rails.
Remove the tray when not in use.
5.8.2
Preparation and Inspection
Ensure all components are secured to the platform.
Check for any missing or damaged components. Replace if necessary.
Check for loose nuts and bolts. If necessary, torque according to the Torque Chart
specifications in the Service Manual.
Replace any missing or illegible decals.
Replace any torn or frayed straps.
5.8.3
Operation
1. Attach the carrier tray to the outside of the platform.
2. Load the Panel Carrier with material and secure with the adjustable bracket.
3. Position the panel to its desired location.
4. Remove the carrier tray when finished.
5.9

PIPE RACKS

Pipe Racks store pipe or conduit inside the platform in order to prevent rail damage and
optimize platform utility. The accessory consists of two racks attached to the lower
platform handrail with adjustable straps that secure the load in place.
ES1932, ES1932i
WARNING
31221541
Accessories
79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es1932i

Table of Contents