4. Rotate levers at the rear of the top platform rails and pull back to release the rails.
5. Fold side rails down to the platform floor.
6. Remove mid-rail pins at front of the platform to release the billboard.
7. Pull up the black billboard cover to access a tray table.
8. Pull up the hanging bar and lock into place, then secure with a pin.

3.14 MACHINE LIFTING AND TIE DOWN

3.14.1
Lifting
The machine may be lifted using a fork lift truck. Lift only from the rear of the machine
and only with the platform in the stowed position. Adjust the width of the forklift
truck, lifting tines (1) to properly fit the machine forklift pockets. Slide the forklift tines
into the forklift pockets and carefully lift machine.
The machine can also be lifted using a spreader bar and four equal length straps or
chains capable of supporting the full gross weight of the machine. Lift only using the
lifting lugs provided at the four corners of the machine.