Installing Busbars - Huawei UPS5000-S-1200 kVA User Manual

Hide thumbs Also See for UPS5000-S-1200 kVA:
Table of Contents

Advertisement

UPS5000-S-1200 kVA
User Manual
Figure 3-18 Recommended channel steel dimensions (unit: mm)
Procedure
Step 1 Determine the cabinet installation positions on the channel steel based on holes in
the marking-off template for channel steel installation.
Step 2 Drill mounting holes on the channel steels using a hammer drill.
Step 3 Remove the side panel from the bypass unit.
Step 4 Combine the power units and bypass unit, and install the connecting plates in the
following sequence: bottom, top, and middle.
Step 5 Install the side panels removed from the bypass unit to power unit 2.
Step 6 Use M12x60 common bolts to secure the power units, bypass unit, and input/
output unit to the channel steel in sequence.
Step 7 Install anchor baffle plates.
Figure 3-19 Installing anchor baffle plates
----End

3.2.2 Installing Busbars

Issue 10 (2023-05-26)