Huawei UPS5000-S200K-SM Quick Manual
Huawei UPS5000-S200K-SM Quick Manual

Huawei UPS5000-S200K-SM Quick Manual

Hide thumbs Also See for UPS5000-S200K-SM:

Advertisement

Quick Links

UPS5000-S-(50 kVA-200 kVA)
Quick Guide
Issue: 06
Part Number: 31507818
Date: 2019-10-16
1
Overview
UPS Model
Cabling Mode
UPS5000-S-
Routed in and out from the
200K-SM
top or bottom
Routed in and out from the
UPS5000-S-
top, routed in and out from
200K-FM
the bottom (install a cable
entry cabinet)
The UPS5000-S-200K-SM is a standard configuration model. The UPS5000-S-200K-FM is a full
configuration model. A UPS in standard configuration has no mains input switch, bypass input
switch, or output switch.
1. Before installation, read the user manual carefully to get familiar with product information and
safety precautions.
2. Use insulated tools when installing the equipment.
3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain
the UPS. Otherwise, personal injury or equipment damage may occur, and the resulting UPS
faults are beyond the warranty scope of Huawei.
4. This document describes the installation procedure for a single UPS. For details about how to
install a parallel system, contact Huawei technical support.
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
Weight (Full
Capacity
Configuration)
330 kg
50 kVA,
100 kVA,
150 kVA,
370 kg
200 kVA
1
Dimensions (H x W
x D)
2000 mm x 600 mm
x 850 mm

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-S200K-SM

  • Page 1 2. Use insulated tools when installing the equipment. 3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain the UPS. Otherwise, personal injury or equipment damage may occur, and the resulting UPS faults are beyond the warranty scope of Huawei.
  • Page 2: Installing The Ups

    UPS5000-S-200K-SM UPS5000-S-200K-FM (1) Power modules (2) Bypass module (3) Control module (CM) (4) Power distribution subrack cover (5) Filler panel (6) Monitor display unit (MDU) (7) Maintenance bypass switch (8) Folder (9) Bypass input switch (10) Main input switch (11) Output switch Installing the UPS Secured Installation 1.
  • Page 3: Connecting Cables

    2. Use a hammer drill to drill four holes for installing expansion bolts and then install four expansion bolts in the holes. Remove the bolt, spring washer, and flat washer. 3. Slide the cabinet on its castors to the installation position. 4.
  • Page 4 UPS Cable Connection Reference • Prepare cables away from the cabinets to prevent scraps from falling inside. Cable scraps may ignite and cause personal injury or device damage. • After cables have been installed, clean the cabinets in a timely manner. Keep the cabinets and surrounding environment clean and tidy.
  • Page 5 Connecting Cables Connecting Cables to the UPS5000-S-200K-SM 2. Remove the cover from the power Scenario 1: Routing Cables from the Top distribution subrack. 1. Remove the small covers of the cabinet top. The cover can be opened only if the maintenance bypass switch is OFF.
  • Page 6 6. Connect the output power cable. 5. Connect the mains and bypass input power cables. 7. Connect the battery cable. 8. Connect signal cables. The number and color of signal cables in the figure are for reference only. Signal cables can be routed along the left or right side of the cabinet.
  • Page 7 Scenario 2: Routing Cables from the Bottom 4. Connect power cables. 1. Remove the cover from the power distribution subrack. 2. Remove the copper bars between mains input terminals and bypass input terminals. 3. Remove small covers from the bottom based on site requirements.
  • Page 8 2. Remove the cover from the power 3. Remove the copper bars between mains distribution subrack. input terminals and bypass input terminals. 5. Connect the mains input 4. Connect the ground cable to the UPS. power cable. 7. Connect the battery cable. 6.
  • Page 9 8. Connect the output power cable. 9. Connect signal cables. Scenario 2: Routing Cables from the Bottom A cable entry cabinet needs to be installed when cables are routed from the bottom. This document uses the cable entry cabinet installed on the right of the UPS cabinet as an example. For the cable entry cabinet installed on the left of the UPS cabinet, refer to the user manual.
  • Page 10 5. Place the cable entry cabinet on the right of 7. (Optional) Secure the cable entry cabinet to the UPS cabinet. the ground. 6. Install the front and rear connecting kits. 8. Install an equipotential plate. 10.Remove the signal cable trough cover from the cable entry cabinet.
  • Page 11: Verifying The Installation

    11.Connect signal cables. 12.Connect power cables. NOTE The figure shows the signal cable routing and For the screw specifications and torque used is for reference only. Connect the cable based for connecting cables in a bottom cable on the actual situation. routing scenario, refer to the top cable routing scenario.
  • Page 12: Powering On And Starting The Ups

    Close the upstream bypass and mains input switches. (Full configuration model) Close the UPS bypass input switch, output switch, and mains input switch. After the UPS is powered on, initialization begins. The MDU displays the Huawei logo and an initialization progress bar.
  • Page 13: Initial Startup

    Initial Startup • If the UPS is powered on for the first time, you need to obtain the startup password from the Service Expert app. Skip this step if the UPS is not powered on for the first time. • The Service Expert app can be downloaded from Google Play Store and can run on Android.
  • Page 14 2. Set the language, time, date, network parameters, and system parameters on the Settings Wizard screen. 3. After you perform the settings, the Bypass mode and No battery alarms are reported by the MDU and do not need to be cleared. If there is any other alarm, you need to rectify the fault. 4.
  • Page 15: Shutting Down The Ups

    Powering On Loads 1. After the inverter starts, the UPS works in normal mode. The Bypass mode alarm disappears from the MDU. 2. After confirming that the battery strings are properly connected, turn on the battery string input circuit breaker. If there are multiple battery strings, turn on the circuit breaker for each battery string and then turn on the general circuit breaker between battery strings and the UPS.
  • Page 16 Scan here for technical support (carrier): Huawei App Store Scan here for more documents: Support-E Support WeChat You can also log in to Huawei technical support website: http://support.huawei.com/enterprise http://support.huawei.com Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China...

This manual is also suitable for:

Ups5000-s-200k-fm

Table of Contents