Front Usb Flex Cable Installation - Keysight N1913B EPM Series Service Manual

Power meters
Table of Contents

Advertisement

6
Repair Guide

Front USB flex cable installation

Instructions
Step 1:
Connect the USB flex cable from the Front Panel to Carrier
Board at P604.
Step 2:
Ensure the USB Flex Cable is leaning on top of earth cable as
shown.
120
Visual
Keysight N1913B/N1914B EPM Series Power Meters Service Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

N1914b epm series

Table of Contents