Keysight N1913B EPM Series Service Manual page 125

Power meters
Table of Contents

Advertisement

Repair Guide
6
Instructions
Visual
Sequence for Front Panel Earth Cable Installation
1) Washer-lock 2190-0646
2) Earth Cable N1912-61018
3) Washer-lock 2190-0646
4) Ground C from top clamshell
5) Nut-Hex 0535-0043
Follow the numbering to install the ground cables.
Join all the earth wires for grounding at front panel
following sequence and tighten the nut by using 9/32"
socket with 9lbs-in.
Keysight N1913B/N1914B EPM Series Power Meters Service Guide
125

Advertisement

Table of Contents
loading

This manual is also suitable for:

N1914b epm series

Table of Contents