Earth Cable Installation At Motherboard For Front Usb Flex Cable Routing - Keysight N1913B EPM Series Service Manual

Power meters
Table of Contents

Advertisement

Earth cable installation at Motherboard for front USB flex cable
routing
Instructions
Earth cable- N1912-61018
Screw- 0515-1940
Washer- 3050-2633
Step 1:
Install the Earth Cable at location shown.
Sequence:
1) Earth Cable N1912-61018
2) Flat Washer 3050-2633
3) Screw 0515-1940
Tighten two screws using bit T8 torque driver with 5lbf-in.
Step 2:
Lift up the Earth Cable as shown.
Keysight N1913B/N1914B EPM Series Power Meters Service Guide
Visual
Repair Guide
6
119

Advertisement

Table of Contents
loading

This manual is also suitable for:

N1914b epm series

Table of Contents