Getting Started - Webasto SVS300 Installation, Operation And Maintenance Manual

Mhe intelligent fast charging systems
Table of Contents

Advertisement

SVS-200

1 Getting Started

Before you begin, take the time to familiarize yourself with the Cautions in Section 2, and read the
installation instructions in Section 4 completely before you install your new SVS-300.
To get your system up and running quickly perform the following steps:
1. Ensure the SVS-300 siting requirements are followed. (Sections 4.5)
2. Connect the 3 phase utility power to the SVS-300, and apply power to the SVS-300. (Sections
4.6)
3. Install the BMID onto the battery pack. (Sections 3)
4. Once the BMID is installed, connect the charger to the battery pack.
5. If your BMID does not come pre-configured, you will need to initialize the new BMID. (Refer to
BMID programming, document #06701)
Once the BMID has been properly programmed, the battery pack is ready to begin charging.
6.
20153-W-03-01
IMPORTANT INFORMATION – SAVE THESE INSTRUCTIONS
Installation, Operation and Maintenance
1
Webasto Charging Systems, Inc.

Advertisement

Table of Contents
loading

Table of Contents