Getting Started - Webasto SVS100 Installation, Operation And Maintenance Manual

Gse intelligent fast charging systems
Table of Contents

Advertisement

1 Getting Started

Before you begin, take the time to familiarize yourself with the Cautions in Section 2, and read
the installation instructions in Section 4 completely before you install your new GSE SVS-100.
To get your system up and running quickly perform the following steps:
1. Ensure the GSE SVS-100 siting requirements are followed. (Sections 4.1 & 4.2)
2. Connect the 3 phase utility power to the GSE SVS-100, and apply power to the GSE SVS-
100. (Sections 4.3 & 4.4)
3. Install the BMID onto the fork lift battery pack. (See Paragraph 2.2)
4. Once BMID is installed, the battery pack may be connected to the charger.
5. If your BMID does not come pre-configured, you will need to initialize the new BMID. (Refer
to BMID programming and Advanced features Manual)
Once the BMID has been initialized, the battery pack is ready to begin charging.
6.
23435-W-03-01
SVS100 Installation, Operation and Maintenance Manual
6
Webasto Charging Systems, Inc.

Advertisement

Table of Contents
loading

Table of Contents