Ziton ZP1-F2 Installation Manual page 76

Table of Contents

Advertisement

Chapter 3: Configuration and commissioning
Battery startup
To power up the control panel from the batteries, press the battery start button on
the control panel PCB (marked as BAT. START, see Figure 20 below). Keep the
button pressed for approximately 5 seconds.
Figure 20: Battery startup button
70
ZP1-F Series Installation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zp1-f seriesZp1-f4Zp1-f8

Table of Contents