Tecomec GEOline GEOSYsTEM 240 Instruction Manual page 80

Table of Contents

Advertisement

Use
19.2 EXAMPLE OF GeoSystem 5W CS INSTALLATION ON 3-SECTION
SPRAYING SYSTEMS
Make sure the system is connected
1
exactly as on Figure 5.
2
In this step, the connection of the
sensors is not important but the valve
cable connections and the
GeoSystem driver box output
connection are.
Make sure all the switches are in the
3
OFF position and turn on the monitor
by pressing the
4
First message depends on Geosystem
model
5
The Firmware version and system
name are then shown.
The "please wait" message then
6
appears.
7
The operating values are then shown.
8
Press the
the same time to enter the
configuration menu.
9
Scroll up and down the menu entries
using the
until the "number of valves" parameter
is reached.
10
Press the
configuration.
key.
and
keys at
and
keys
key to enter the
GeoSystem RevA5
79
-

Advertisement

Table of Contents
loading

Related Products for Tecomec GEOline GEOSYsTEM 240

Table of Contents