Tecomec GEOline GEOSYsTEM 240 Instruction Manual page 63

Table of Contents

Advertisement

Use
15.4
NEW TREATMENT
1
To start the recording of data for a new
treatment, select any operating cycle
parameter, with the exception of the
parameter: "Tank Level"."
2
Press the
3
At this point, all the counters are reset.
Pressing this key for 5 seconds DOES NOT prepare the system for a new treatment but
15.5
TURNING ON GeoSystem
1
Turn on the monitor by pressing
.
2
First message depends on Geosystem
model
3
The Firmware version and the system
name then appear.
Then the "Please wait" message is
4
shown.
5
If the main valve is on (switch in the
ON position), when the monitor is
turned on, a warning message will
appear and a buzzer will sound.
62
-
key for 5 seconds.
The "Tank level" parameter is a special parameter:
for the refilling of the tank.
GeoSystem RevA6

Advertisement

Table of Contents
loading

Related Products for Tecomec GEOline GEOSYsTEM 240

Table of Contents