Configuration
10.8 HARDWARE INSTALLATION CHECK
Before using the GeoSystem, check the correct installation of each component:
•
Check that the connectors are in the right sockets
•
Check that the cables are the correct length
•
Check that all screws are fully tightened
•
Check the polarity and the supply voltage
The GeoSystem must be powered directly from the battery, and must not be connected to
a key-operated socket (a 10 A protection fuse must be installed).
When using valve assemblies with calibrated return, the correct functioning of the
GeoSystem is guaranteed only by the accurate calibration of all the sensors and the
proper calibration of the return flows.
11 DESCRIPTION OF CROP SPRAYER
(CS) MONITOR
11.1 LIST OF KEYS AND SWITCHES AND THEIR FUNCTIONS
Monitor with alphanumeric display, keys and
control switches
16
-
Figure 14 – CS monitor
GeoSystem RevA6