Hardware Installation Check - Tecomec GEOline GEOSYsTEM 240 Instruction Manual

Table of Contents

Advertisement

Configuration

10.8 HARDWARE INSTALLATION CHECK

Before using the GeoSystem, check the correct installation of each component:
Check that the connectors are in the right sockets
Check that the cables are the correct length
Check that all screws are fully tightened
Check the polarity and the supply voltage
The GeoSystem must be powered directly from the battery, and must not be connected to
a key-operated socket (a 10 A protection fuse must be installed).
When using valve assemblies with calibrated return, the correct functioning of the
GeoSystem is guaranteed only by the accurate calibration of all the sensors and the
proper calibration of the return flows.
11 DESCRIPTION OF CROP SPRAYER
(CS) MONITOR
11.1 LIST OF KEYS AND SWITCHES AND THEIR FUNCTIONS
Monitor with alphanumeric display, keys and
control switches