Automatic Operation; Manual Operation - Tecomec GEOline GEOSYsTEM 240 Instruction Manual

Table of Contents

Advertisement

Use
which is reset to the value set during
the configuration phase.
15.8

AUTOMATIC OPERATION

Automatic operation is indicated by the letter A on the left-hand side of the display. The
value in brackets is the dosage set by the user; GeoSystem will control the regulating
valve to keep the dosage constant as the vehicle speed varies.
15.9

MANUAL OPERATION

Manual operation is indicated by the letter M on the left-hand side of the display.
GeoSystem will record the operating data shown during the operation.
15.10
TANK REFILLING DURING A TREATMENT
1
If the field being treated requires an
greater amount of liquid than the
amount in the tank, it will be necessary
to refill the tank one or several times.
2
Each time there is a refill, the tank
level must be updated (parameter:
"Tank Level")
Select the parameter: "Tank Level"
3
4
Press the
5
Press the
the quantity of liquid put into the tank.
6
The parameter is automatically
updated with the maximum tank
capacity value (parameter: "Tank
capacity").
If the "Tank level" parameter is NOT selected, pressing the key for 5 seconds will
prepare the system for a new treatment, resetting all the counters.
7
To modify the value, enter the
modifying phase by pressing the OK
key and using the
66
-
key for 5 seconds.
key to manually set
The "Tank level" parameter is a special parameter:
and
GeoSystem RevA6

Advertisement

Table of Contents
loading

Related Products for Tecomec GEOline GEOSYsTEM 240

Table of Contents