Emerson ControlWave Instruction Manual page 107

I/o expansion rack
Hide thumbs Also See for ControlWave:
Table of Contents

Advertisement

Figure 5-9. New I/O Module in Place Prior to Attaching Terminal Board and Terminal Housing
Revised Aug-2015
ControlWave I/O Expansion Rack Instruction Manual
Assembly
Take the terminal block board and terminal housing assembly,
7.
with all the I/O wiring, that you removed in step 4, and line up
its fasteners with the holes on the module, now seated in the
housing, and gently push the terminal block board and terminal
housing assembly into the module and tighten the fasteners.
When the new board starts, and is functioning properly, return
8.
any processes you put into manual control to automatic control.