Intel® Server System M50FCP2UR System Integration and Service Guide
2.2.2
System Cover Installation
For each top cover panel:
1. Carefully align and set the top cover panel on top of the chassis. Then, slide it inwards until it locks
into place (see Letter A).
Shipping Note: When transporting the server system, Intel recommends installing the four top cover screws
before shipping.
2.3
Air duct Removal / Installation
Required Tools and Supplies
Anti-static wrist strap and conductive workbench pad (recommended)
•
The Intel® Server System M50FCP2U supports three air duct options. The type used depends on the system
configuration:
(Default) Standard air duct for systems configured with 2U processor heat sinks
•
Air duct option for systems configured with 1U processor heat sinks
•
•
Air duct option for systems configured with high-power, General-Purpose Graphics Processing Unit
(GPGPU) add-in cards. 1U processor heat sinks required
Note: Always operate the server system with the air duct in place. The air duct is required for proper airflow
within the server system.
See
Section 5.6
for views of each air duct option.
Figure 6. System Top Cover Installation
23