Boom Cleanliness Guidelines - JLG 600SC Service And Maintenance Manual

Table of Contents

Advertisement

Inspection
NOTE: When inspecting pins and bearings Refer to Section 2.5 -
Pins and Composite Bearing Repair Guidelines.
1. Inspect fly boom pivot pin for wear, scoring, tapering
and ovality, or other damage. Replace pins as necessary.
2. Inspect fly boom pivot attach points for scoring, taper-
ing and ovality, or other damage. Replace pins as neces-
sary.
3. Inspect inner diameter of fly boom pivot bearings for
scoring, distortion, wear, or other damage. Replace bear-
ings as necessary.
4. Inspect lift cylinder attach pin for wear, scoring, tapering
and ovality, or other damage. Ensure pin surfaces are
protected prior to installation. Replace pins as neces-
sary.
5. Inspect inner diameter of rotator attach point bearings
for scoring, distortion, wear, or other damage.
6. Inspect all threaded components for damage such as
stretching, thread deformation, or twisting. Replace as
necessary.
7. Inspect structural units of jib boom assembly for bend-
ing, cracking, separation of welds, or other damage.
Replace boom sections as necessary.
Assembly
1. Align lift cylinder with attach holes in jib assembly.
Using a soft head mallet, install cylinder pin (7) into jib
and secure with mounting hardware.
2. Align rotator support with attach hole in jib assembly.
Using a soft head mallet, install rotator support pin (6)
into jib and secure with mounting hardware.
3. Align bottom tubes with attach holes in rotator support.
Using a soft head mallet, install rotator support pin (5)
into jib assembly and secure with mounting hardware.
4. Align jib assembly with attach hole in jib boom pivot
weldment. Using a soft head mallet, install rotator sup-
port pin (4) into jib assembly and secure with mounting
hardware.
5. Align bottom tubes with attach holes in jib boom pivot
weldment. Using a soft head mallet, install rotator sup-
port pin (3) into jib boom pivot weldment and secure
with mounting hardware.
3121776
SECTION 4 - BOOM & PLATFORM
Installation
1. Align jib boom pivot weldment with attach holes in fly
boom assembly. Using a soft head mallet, install pivot
pin (2) into fly boom assembly and secure with mount-
ing hardware.
2. Align the slave leveling cylinder with attach holes in jib
boom pivot weldment. Using a soft head mallet, install
slave leveling cylinder pin (1) into articulating jib boom
pivot weldment and secure with mounting hardware.
3
1
JIB BOOM PIVOT
SLAVE CYLINDER
JIB LIFT CYLINDER

4.16 BOOM CLEANLINESS GUIDELINES

The following are guidelines for internal boom cleanliness for
machines used in excessively dirty environments.
1. JLG recommends use of JLG Hostile Environment Pack-
age to keep internal portions of a boom cleaner and
help prevent dirt and debris from entering the boom.
This package reduces the amount of contamination
which can enter the boom, but does not eliminate the
need for more frequent inspections and maintenance
when used in these types of environments.
2. JLG recommends you follow all guidelines for servicing
your equipment in accordance with instruction in the
JLG Service & Maintenance Manual for your machine.
Periodic maintenance and inspection is vital to proper
operation of the machine. Frequency of service and
maintenance must be increased as environment, sever-
ity, and frequency of usage requires.
3. Debris and contamination inside the boom can cause
premature failure of components and should be
removed. Methods to remove debris should always be
done using all applicable safety precautions outlined in
the JLG Operation & Safety Manual and the JLG Service
& Maintenance Manuals.
4
2
JIB
7
6
ROTATOR
5
MAE31390
4-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

660sjc

Table of Contents