JLG 600SC Service And Maintenance Manual page 130

Table of Contents

Advertisement

SECTION 4 - BOOM & PLATFORM
23. Install the four bolts, shims, and bars that secure the
telescope cylinder rod to the boom base section. Torque
the bolts to 40.6 ft. lbs. (55 Nm).
24. Route extend cable through cable block and install the
cable block on base boom.
4-14
25. Install the hardware securing spring mounting plate and
spring to the cable block.
MAE22960
26. Install base boom cover plate to base boom at the end
of the boom section.
27. Install the cover plate and sheave blocks.
28. Connect the hydraulic hoses to the telescope cylinder as
tagged during removal.
29. Adjust the boom cables. Refer to Section 4.13, Wire Rope
Tensioning Adjustment.
30. Install jam nuts and nuts which secure the wire rope.
MAE22940
MAE22930
3121776

Advertisement

Table of Contents
loading

This manual is also suitable for:

660sjc

Table of Contents