Smartgen HGM9510 User Manual page 37

Genset parallel (with genset) controller
Hide thumbs Also See for HGM9510:
Table of Contents

Advertisement

No.
Items
2
Active Type
Flexible Output Port 3
1
Contents Setting
2
Active Type
Flexible Output Port 4
1
Contents Setting
2
Active Type
Flexible Output Port 5
1
Contents Setting
2
Active Type
Flexible Output Port 6
1
Contents Setting
2
Active Type
Sync Setting - Basic
1
Dead Bus Volt
2
Voltage Difference
Positive
3
Difference
Negative
4
Difference
Phase
5
Difference
6
Slip Frequency Sync
7
MSC ID
8
MSC Priority
9
Full kW rating
10
Full kVar rating
11
Baud Rate
12
Scheduled Run PCT
13
Scheduled Stop PCT
14
Load Ramp Rate
15
Load Ramp Point
HGM9510 Genset Parallel Controller User Manual
Parameters
(0~1)
(0~299)
(0~1)
(0~299)
(0~1)
(0~299)
(0~1)
(0~299)
(0~1)
(10-50)V
(0-30)V
Freq
(0-2.0)Hz
Freq
(0-2.0)Hz
Angle
(0-20)°
(0-1.00)Hz
(0-31)
(0-31)
(0-20000)kW
(0-20000)kvar
(0-3)
(0-100)%
(0-100)%
(0.1-100.0)%
(0.1-40.0)%
Defaults
0
0: Normally open;
38
Energize to Stop. See table 14.
0
0: Normally open;
35
Idle Control. See table 14.
0
0: Normally open;
30
Open Gen Output. See table 14.
0
0: Normally open;
29
Close Gen Output. See table 14.
0
0: Normally open;
It is considered Bus no power when Bus
30
voltage is lower than dead Bus voltage.
It is considered voltage synchronization when
the voltage difference between Generator and
3
Bus is lower than synchronization voltage
difference.
It is considered frequency synchronization
0.2
when the frequency difference between
Generator and Bus is less than Check Up Freq
0.1
but more than Check Low Freq .
It is considered Check Phase Angle when the
10
initial
phase
synchronization phase difference.
Adjust generator frequency and enable it
0.10
greater than Bus frequency.
It is the ID mark of the MSC communication
1
internet. All the MSC ID should be unique.
0
Smaller values represent higher priorities.
276
Used for load sharing.
210
Used for load sharing.
0: 500kbps; 1: 250kbps;
1
2: 125kbps; 3: 50kbps.
Schedule the load value of other genset when
80
start on demand.
Schedule the load value of other genset when
50
start on demand.
3.0
Speed rate(%/s) of genset upload/unload
10.0
Description
1: Normally close
1: Normally close
1: Normally close
1: Normally close
1: Normally close
difference
is
lower
Page 37 of 68
than

Advertisement

Table of Contents
loading

Table of Contents