Leveling The Equipment - Vatech PHT-30CSS Installation Manual

Hide thumbs Also See for PHT-30CSS:
Table of Contents

Advertisement

4. Installing the Equipment: Base Stand (Optional)
4.7

Leveling the Equipment

Required Tool
1.
Prepare a Spirit Level.
2.
Turn the Rotating Unit clockwise so that the X-ray tube head faces the front.
3.
Turn all nine screws in marked locations clockwise.
64
T-shaped Hex
Wench
Spirit Level
Ensure to place the Spirit Level on the indicated
locations in this manual for an accurate reading.
vatech A9 (Model:PHT-30CSS)
8 mm / 0.3"
N/A
Installation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PHT-30CSS and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

A9

Table of Contents