4. Installing the Equipment: Base Stand (Optional)
Leveling the Front and Back
1.
Place the Spirit Level vertically, as shown in the image.
2.
Turn Screws in marked locations left and right until the Sprit Level bubble comes
to the center.
3.
When leveling the equipment is completed, ensure to tighten all eight Screws
until they no longer move.
66
vatech A9 (Model:PHT-30CSS)
Installation Manual
Need help?
Do you have a question about the PHT-30CSS and is the answer not in the manual?
Questions and answers