Vatech PHT-30CSS Installation Manual page 67

Hide thumbs Also See for PHT-30CSS:
Table of Contents

Advertisement

2.
Drill the floor holes of size 12 mm x 30 mm (depth) using the concrete hammer
drill.
3.
Remove the debris and clean the holes using the dust pump.
4.
Remove nuts and washers, put the anchor bolts into the holes.
5.
Secure the anchor bolts with the hammer.
vatech A9 (Model: PHT-30CSS)
4. Installing the Equipment: Base Stand (Optional)
Installation Manual
57

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PHT-30CSS and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

A9

Table of Contents