4. Installing the Equipment: Base Stand (Optional)
4.4
Fixing the Base (Optional)
Concrete Floor
Required Tool
Parts and
Accessory
1.
Place the Base Unit on the floor where you planned to install the equipment.
And mark two locations to insert anchor bolts. (see below)
56
Hammer Drill
Tips: 3 mm - 8 mm
Ratchet Wrench
Hammer
5/16 x 60 w/ Spring
and Flat Washers -
Anchor Bolt
Spring washer
vatech A9 (Model:PHT-30CSS)
L = 200 mm
(7+-.9")
(0.12" - 0.3")
N/A
2 pcs
(Part No. 34)
M8 - 2 pcs
(Part No. 34)
Installation Manual
Need help?
Do you have a question about the PHT-30CSS and is the answer not in the manual?
Questions and answers